Remodels make debris, and residential remodels make it on a residential lot — a driveway, a tight court, a street a semi shouldn't be blocking for a week. The big roll-off the national haulers drop is sized for a ground-up job site. It's overkill for a kitchen, and it's a problem for the driveway.
Frontier's bins are sized for the actual work: a right-sized bin that fits where the crew parks, dropped by a no-CDL trailer that doesn't tear up the approach. Contractors, remodelers, and DIY renovators use them for exactly this.
What goes in a remodel bin
- Demo debris — drywall, plaster, lath, old insulation, ripped-out trim.
- Flooring — carpet and pad, laminate, vinyl, hardwood, and subfloor. (Tile and stone are heavy — read the weight note below.)
- Cabinets and fixtures — kitchen and bath tear-outs, countertops, vanities, closet systems.
- Framing and wood — studs, plywood, sheathing, deck boards, fencing.
- Roofing — shingles and underlayment from a re-roof. Shingles are dense; a smaller bin fills by weight long before it fills by volume.
- Windows, doors, and siding — the exterior side of a remodel.
Sizing a bin to the job
The trap on a remodel is renting by how the pile looks instead of what it weighs.
- 5 yard — a single-room demo, a bath gut, a small flooring job.
- 10 yard — a kitchen remodel, a couple of rooms, a mid-size renovation. The workhorse.
- 15 yard — a whole-floor gut, a big addition's demo phase, a large re-roof.
For light, bulky material — cabinets, carpet, framing — size to the volume. For dense material — tile, plaster, shingles — size down and expect to fill by weight. A 15 yard bin loaded with tile can hit its weight limit half full. When a job mixes both, we'll talk through whether one bin or a swap makes more sense.
Swaps keep a job moving
On a phased remodel you don't want the bin full on day three with two weeks left. We swap a full bin for an empty one so the crew never stops for lack of somewhere to put debris — full one goes, empty one lands, work continues. Tell us the phase plan and we'll set the drops around it.
Keeping the site clean and the neighbors calm
A remodel on a residential street has an audience. A bin overflowing onto the driveway, debris blowing into the neighbor's yard, nails ending up in the gutter — that's how a good remodel earns a bad name on the block. A right-sized bin with the door swung so the crew walks debris in, emptied on a swap before it overtops, keeps the site tidy and the complaints down.
It also keeps the load legal. An overloaded bin — material heaped above the rails — can't be hauled; it has to be knocked down first, which costs you a trip. We load to the fill line, not over it, and on a phased job we swap before it gets there. Give us the rhythm of the work and we'll match the drops and pickups to it, so the bin is never the thing holding up the crew.
The weight conversation, honestly
Every construction bin carries a weight allowance, and demo debris is heavy. Overage past the allowance bills by the ton at the landfill scale — standard everywhere, and the single biggest surprise on a remodel dumpster when nobody explained it up front. We do explain it up front. Dense loads — tile, plaster, mortar, shingles, concrete — are the ones to flag; genuinely heavy material like concrete and dirt belongs in heavy debris, which is priced for weight from the start.
Keep it on the driveway, keep it simple
A bin on the job's own driveway or pad usually needs no permit. A bin in the street does in most Front Range cities — a right-of-way or obstruction permit, with rules that vary by town. The verified rule for each city is on its service-area page. Keeping the bin on-site is one more reason the driveway-friendly size beats the semi-dropped roll-off on a residential remodel.
Running a remodel and need debris handled? Get a quote — tell us the scope and the material and we'll size it right.
Questions we get asked
- What size dumpster do I need for a remodel?
- A single-room or bath demo fits the 5 yard; a kitchen or multi-room remodel fits the 10 yard; a whole-floor gut or big re-roof wants the 15. Size to volume for light material like cabinets and carpet, and size down for dense material like tile and shingles, which fill by weight.
- Can you swap a full bin for an empty one mid-project?
- Yes. On a phased job we haul the full bin and drop an empty one so the crew never stops for lack of somewhere to put debris. Give us the phase plan and we'll schedule the swaps around it.
- Can I put roofing shingles in the bin?
- Yes, and they're one to watch. Shingles are dense — a bin loaded with them hits its weight allowance long before it looks full. For a re-roof we'll size the bin to the weight, not the volume.
- Do you work with contractors or just homeowners?
- Both. Contractors and remodelers use our driveway-friendly bins because they fit the residential jobs they actually run, and DIY renovators use them for the same reason. We can set recurring drops and swaps for a crew running several jobs.
- What about concrete, brick, and dirt from the job?
- That's heavy debris, and it's priced differently — by weight from the start, often in a dedicated bin. Don't mix a lot of it into a general construction bin or the weight overage adds up fast. See our heavy-debris service.
The rest of what we haul
Read up
Construction Debris near you
Denver · Lakewood · Arvada · Wheat Ridge · Golden · Littleton · all cities
Tell us the job — we'll size it right.
Describe the project and the material and we'll pick the bin, explain the weight, and quote a number that holds. Same-week drop-off is normal on the Front Range.